ASTM D3966 PDF

0 Comments

This standard is issued under the fixed designation D ; the number 1 This test method is under the jurisdiction of ASTM Committee D on Soil and Rock. This test method covers procedures for testing vertical and batter piles either individually or in groups to determine the load-defection relationship when. Grout Systems performs lateral load testing based on ASTM D, the standard test method for piles under lateral loads. Lateral Load Tests provide the most.

Author: Tehn Nikogami
Country: Bulgaria
Language: English (Spanish)
Genre: Art
Published (Last): 7 June 2013
Pages: 42
PDF File Size: 10.34 Mb
ePub File Size: 13.76 Mb
ISBN: 207-9-32366-902-3
Downloads: 61335
Price: Free* [*Free Regsitration Required]
Uploader: Dagrel

When performed as part of a multiple-pile test program, the designer may also use the results to assess the viability of different piling types and the variability of the test site. How one applies the results obtained ast this standard is x3966 its scope. Imperative sentences indicate mandatory provisions. Plans, specifications, provisions, or combinations thereof prepared by a qualified engineer may provide additional requirements and procedures as needed to satisfy the objectives of a particular test program.

Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard. Combining values from the two systems may result in non-conformance with the standard.

Reliable results depend on many factors; Practice D provides a dd3966 of evaluating some of those factors. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Users of this test method are cautioned that compliance with Practice D does not in itself assure reliable results. Test results may also provide information used to assess the distribution of lateral resistance along the pile shaft and the long-term load-deflection behavior.

  AMPLIFICADOR DERIVADOR PDF

Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, are entirely their own responsibility. The engineer in responsible charge of the foundation design, referred to herein as the engineer, shall approve any deviations, deletions, or additions to the requirements of these test methods.

A foundation designer may evaluate the test results to determine if, after applying an appropriate factor of safety, the pile or pile group has an ultimate lateral capacity and a deflection at service load satisfactory to satisfy specific foundation requirements.

Combining values from the two systems may result in non-conformance with the standard.

Link to Active This link will always route to the current Active version of the standard. Plans, specifications, provisions, or combinations thereof prepared by a qualified engineer may provide additional requirements and procedures as needed to satisfy the objectives of a particular test program.

These notes and footnotes excluding those in tables and figures shall not be considered as requirements of the test methods. The test results may not represent the long-term f3966 of a deep foundation.

Note 1 — The d39666 of the result produced by this test method is dependent on the competence of the personnel performing it, and the suitability of the equipment and facilities used.

These notes and footnotes excluding those in d366 and figures shall not be considered as requirements of the test methods. Link to Active This link will always route to the current Active version of the standard.

ASTM D/DM – 07()e1 – Standard Test Methods for Deep Foundations Under Lateral Load

In this system, the pound lbf represents a unit of force weightwhile the unit for mass is slugs. How one applies the results obtained using this standard is beyond its scope. These test methods also include illustrations and appendices intended only for explanatory or advisory use. R3966 this system, the pound [lbf] represents a unit of force [weight], while the unit for mass is slugs.

  ANIMA CORE RULEBOOK PDF

ASTM D3966/D3966M – 07(2013)e1

These methods apply to all deep foundations, referred to herein as “pile s ,” that function in a manner similar to driven piles or cast in place piles, regardless of their method of installation, and may be used for testing single piles or pile groups.

Specified Lateral Movement Optional. Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

Imperative sentences indicate mandatory provisions. The text of these test methods references notes and footnotes which provide explanatory material. See Appendix X1 for comments regarding some of the factors influencing the interpretation of test results.

The text of these test methods references notes and footnotes which provide explanatory material. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. The word “shall” indicates a mandatory provision, and the word “should” indicates a recommended or advisory provision.

Active view current version of standard. Tests dd3966 achieve a failure load may help the designer improve the efficiency of the foundation by reducing the piling length, quantity, or size. Users of this standard are wstm advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, are entirely their own responsibility.